“Tsygankov” construction department provides the following services:
– conducts feasibility study, which identifies the main technical and economic parameters;
– develops process flow diagram of the concentration-distillation plant for producing raw alcohol as well as adsorption systems for dehydration;
– calculates the material flows all the installations; – develops requirements for equipping the installations and equipment specifications;
– places an order for equipment for machine-building enterprises and implements supervision of the manufacturer;
– develops scheme of production processes control and automation;
– carries out installation of technological equipment and automation systems;
– implements supervision of installations commissioning into commercial operation;
– trains the personnel to operate installations.